Selected work · 2022 — 2026

Thirteen projects. Four industries. North America.

Recent delivered work across power & utilities, oil & gas, manufacturing, and R&D — from Alberta down to the Gulf and across the American West. Client names withheld by agreement; scope and location are accurate.

Full catalogue

2022 — 2026 · 13 delivered projects.

Grouped by industry. Scope is described generically so client confidentiality is preserved; year and region are accurate.

Power & Utilities

6 projects

Distributed generation, turbine controls, and power-plant control systems — including data-center and crypto-mining infrastructure delivered across the American West.

2026
Williston, ND
10 MW power-plant generator control
Full generator control stack — protection, synchronization, load-sharing, and remote monitoring. Delivered from single-line through commissioning.
2024
Roosevelt, UT
50 MW distributed generation plantData Center
Turnkey distributed generation infrastructure for a large-scale data-center load. Full control system, protection, and grid interface.
2022–2024
Williston, ND (3 sites)
3× 18 MW gas-turbine control deploymentsData Center
Three separate turbine installations, each delivering 18 MW of generation. Full control-system design, deployment, and commissioning across all three sites.
2023
Hobbs, NM
50 MW distributed generation plantData Center
Distributed generation infrastructure for a data-center load. Design and deployment of the full generator and control system.
2023
Midland, TX
12 MW generator deployment
12 MW distributed-generation build covering electrical design, control-system specification, and on-site deployment.
2023
Alberta
Asynchronous generator control upgrade
Full control-system modernization for an asynchronous generator — replacement of legacy control hardware with current-generation logic and HMI.

Oil & Gas

2 projects

Process facilities in the Williston basin — flare-gas mitigation plants from design through commissioning.

2026
Williston, ND
Flare-gas mitigation facility (project 2)
Second flare-gas mitigation build in the Williston basin — full process facility capturing and repurposing flare gas that would otherwise be burned off.
2025
Williston, ND
Flare-gas mitigation facility (project 1)
First flare-gas mitigation facility in the Williston basin. Design through commissioning of the process plant that captures and repurposes flare gas.

Manufacturing

3 projects

Plant-wide SCADA deployments, machinery safety systems to ISO 13849-1, and full-facility electrical assessments.

2025
Edmonton, AB
Plant-wide SCADA — phase 1
First phase of a plant-wide SCADA deployment — unifying monitoring, control, and data collection across multiple production lines.
2025
Edmonton, AB
PLd Cat 3 safety-gate system
Machinery safety-gate system designed and commissioned to Performance Level d, Category 3 compliance (ISO 13849-1). Full interlock logic, verification, and documentation.
2024
Kingman, AZ
Electrical site survey, SLDs & code inspection
Field survey of the entire manufacturing facility, construction of single-line drawings, and identification of electrical code violations requiring remediation.

R&D & Prototyping

2 projects

Custom prototypes, pilot systems, and first-of-kind builds — including international delivery.

2026
Edmonton, AB
Multi-axis robotic manufacturing jig
Custom robotic-jig prototype for a manufacturing application — multi-axis control, mechanical design coordination, and full commissioning.
2025
Edmonton, AB → NZ
Geothermal testing unit (exported to NZ)International
Full prototype-to-delivery engineering of a geothermal-testing unit. Designed, built, commissioned in Edmonton; shipped internationally to New Zealand for field use.

Have a project that belongs on this list?

Tell us what you're scoping. We'll tell you what it takes to deliver it.

Start a conversation →